Wednesday, 18 March 2009

VJ project feb 09

Vjing at the Haverhill Rock Competition Finals (28th Febuary 2009): By Aaron Williams



Setting up was the first thing that me and Andrew had to do when we arrived. From 2pm till aprox 7pm we had to set up the Vjing equiptment, which consisted of two TV’s, a apple mac, a I Mac and a Edirol mixer. The when we came to trying to set up the videoing equipment we found out that we didn’t have the connectors for the wires as michelle had them and she wasn’t arriving until 7pm which was too late so we then had to go roud town going into shops to find them but we couldnt so we improvised. We used normal wires for a TV. After that we had another problem as we couldn’t find the power packs for the camcorders so we ended up having two camcorders one which was powered by electricity, another that was battery powered and i suggested to use a stills camera on movie mode. We connected the two TV’s up to the mixer and we had one TV with the live feed and the other with the cameras and the computers. With everything up and running we started at aprox 7.30pm andd every thing went to plan we had worked out a rota for every one when they turned up and the night finnished at about 11pm with half an hour of packing away